Drilling Post and Prepping Head
-
-
Framing Wall at Kitchen Window
-
-
Setting Bedroom #4 Window
-
-
Window Installed in Bedroom #4
-
-
Framing Added Pocket Door Bedroom #1
-
-
Back To Back Shower Valves
-
-
HVAC Duct
-
-
Installing Electrical Panel
-
-
Installing Rigid Air Duct
-
-
Scaffolding
-
-
Backfill and compact at basement
-
-
Planter Walls at Rear Courtyard
-
-
Pumping grout at RW
-
-
Stripping Forms at the Podium Deck
-
-
Waterproofing at basement walls
-
-
Fitting Stainless Steel Sill Pan
-
-
Installing Lights in Guest Bedroom #1
-
-
Installing Window at Kitchen
-
-
Window Installed at Kitchen
-
-
X-Ray Concrete for Core Drilling
-
-
Framing Pickup Work
-
-
Installing Windows in Guest Bedroom #1
-
-
Installing Lights in Upper Hallway
-
-
Installing Windows
-
-
Testing Shower Seat
-
-
Bathroom Plumbing
-
-
Bedroom #4 Pickup Framing
-
-
Framing Roller Shade Pockets
-
-
Installing Water Supplies at Bedroom #1
-
-
Water Supply Layout at Master Bathroom
-
-
Framing bathroom Skylight Well
-
-
Furring Garage Ceiling
-
-
Loading Windows to Upper Floor
-
-
Prepping Columns for Paint
-
-
Priming Exposed Steel Columns
-
-
Fabricating Inside Skylight Well
-
-
Installing Skylight Well
-
-
Roof Drains Through Kitchen Wall
-
-
Roof Hot Mopped
-
-
Rough Plumbing
-
-
Fireplace Flue Termination
-
-
Framing Second Floor Walls
-
-
Patching Holes for Hotmop
-
-
Plating Second Floor Walls
-
-
Roof Drain and Overflow
-
-
Ceiling above stair 005
-
-
Ceiling at landing 006
-
-
Hall arches 004
-
-
Living room soffits 001
-
-
Living room Soffits 002
-
-
Arches 001
-
-
Chandalier hoist 006
-
-
Kitchen arches 002
-
-
Poppy Elevation 003
-
-
Roof Dried in 002
-
-
Galleria 002
-
-
Laundry door 002
-
-
Main stairwell ceiling 003
-
-
Roof papper delivery 002
-
-
Sugars tub area001
-
-
Main stairwell ceiling 001
-
-
Mikes office 003
-
-
Windows and doors 001
-
-
Windows and doors 002
-
-
Windows and doors 003
-
-
Building Soffit in Great Room
-
-
Covering Roof With Plastic
-
-
Installing Garage Header
-
-
Installing Scaffolding
-
-
Plating Second Floor Walls
-
-
Holes Drilled for Ventalation
-
-
Installing Slopping Rafters on Flat Roof
-
-
Sheet Slopped Roof
-
-
Sheeting Mezzaine
-
-
Sloping Roof
-
-
Core Drilling for Roof Drain
-
-
Framing Garage Mezzanine
-
-
Mezzanine Framing
-
-
Roof Height Certification
-
-
Roof Sheeting Complete
-
-
Beam to Moment Frame
-
-
Excavating Electrical Conduit
-
-
Roof Joist
-
-
Sheeting Lower Roof (2)
-
-
Sheeting Upper Roof
-
-
Queen ann new window 001
-
-
Sugars office 008
-
-
Sugars bath 005
-
-
Sugars office 004
-
-
Windows 003
-
-
A frame beam 001
-
-
A frame beam 002
-
-
A frame beam 003
-
-
portico arch 003
-
-
zone controllers 001
-
-
Drilling Holes in I-beam
-
-
Installing 3 x Nailer on Steel Roof Rafters
-
-
Installing Ledgers & Roof Rafters
-
-
Nailers & Rafters
-
-
Roof Rafters
-
-
3 x Beams ontop of Steel Roof Beams
-
-
Installing Nailer Ontop of Steel Tube Roof Beam
-
-
Lower Roof & Sklylight Framing
-
-
Mezzanine Steel Framing
-
-
Prepping Steel for Roller Shade Installation
-
-
Can Lights 001
-
-
Can Lights 002
-
-
Roof 001
-
-
Sill Plate Water Proofing 005
-
-
Roof Cricket 002
-
-
Elevations 001
-
-
Elevations 002
-
-
Elevations 003
-
-
Mikes Shower 001
-
-
Sugars Shower 002
-
-
Laundry Room 001
-
-
Laundry Room 003
-
-
Queen Ann Ceiling 002
-
-
Upstairs Hall 003
-
-
TV Room Barrel 001
-
-
Building East Side
-
-
Framing Lower Roof
-
-
Roof Beam Welding & Wood Framing
-
-
Roof Ledger Beam Layout
-
-
Welding Steel Roof Beams
-
-
Bed 2 Deck
-
-
Completed Fireplace Install
-
-
Ejection Tank
-
-
Front Right
-
-
Rear Deck
-
-
Checking Beam Alignment
-
-
Grinding Welds
-
-
Hoisting Genie Lift
-
-
Welding Moment Frame
-
-
Weling Beams for Skylight Bath #4
-
-
Corner Window Framing for Cladding
-
-
Floor Framing & Shear Blocking
-
-
Hook Up of Waste Line
-
-
Second Floor Shear Blocking
-
-
Straightening Steel Beams
-
-
Bunk Room Framing 2
-
-
Bunk Room Framing
-
-
Ceiling Drop
-
-
Scaffold 3
-
-
Second Floor Shear and Rafters
-
-
Bunk Room Ridge
-
-
Pool View
-
-
Ridge Beam
-
-
Second Floor Walls 4
-
-
Second Floor Walls Street
-
-
Office Shear
-
-
Second floor and Roof Cuts
-
-
Second Floor Plating
-
-
Second Floor Rake Wall
-
-
Stairwell Framing
-
-
Albertini delivery 2
-
-
Albertini delivery 6
-
-
Laundry rm 1
-
-
Laundry rm 3
-
-
Albertini delivery 1
-
-
Hazel Elevation 3
-
-
Hazel elevation 4
-
-
Rafter tails 2
-
-
Rafter tails 3
-
-
Stair beam 1
-
-
HVAC in progress 1
-
-
HVAC in progress 2
-
-
HVAC in progress 3
-
-
Exterior elevation framing 1
-
-
Exterior elevation framing 2
-
-
Exterior elevation framing 3
-
-
Green room arch 1
-
-
Powder hall duct work 2
-
-
Roof 4
-
-
Roof 5
-
-
Steel at roof and master 2
-
-
Butlers duct work
-
-
Dutch windows
-
-
Living duct work
-
-
Master roof line 1
-
-
Master roof line 2
-
-
Poppy elevation 1
-
-
Poppy elevation 2
-
-
Roof rafters 1
-
-
Roof rafters 2
-
-
Roof rafters 4
-
-
Roof Rafters 2
-
-
Scaffolding and rafters 1
-
-
Scaffolding and rafters 2
-
-
Scaffolding set 1
-
-
Lumber delivery
-
-
Main Stairs
-
-
Master framing 1
-
-
Second floor framing 2
-
-
Second floor framing 3
-
-
Shear walls kitchen
-
-
Framing main stairwell 3
-
-
Framing main stairwell 4
-
-
Framing stair stringer 1
-
-
Second floor framing 1
-
-
Second floor framing 2
-
-
Framing second level 3
-
-
Main staircase 1
-
-
Second floor sheeting 2
-
-
Staircase stringer temp wall 4
-
-
Floor joist 2
-
-
Floor joist dining 1
-
-
Framing entry 2
-
-
Framing main level 1
-
-
Stairs Framing main level 2
-
-
Basement framing 1
-
-
Basement framing 2
-
-
Framing 1
-
-
Framing 2
-
-
Standing walls main floor 1
-
-
Standing walls main floor 2
-
-
Framing basement 1
-
-
Framing basement 2
-
-
Framing basement 3
-
-
Framing over basement 1
-
-
Framing over basement 2
-
-
Moment Frame at Garage
-
-
Moment Frame Welding Bedroom #4
-
-
Moment Frame Welding
-
-
Prepping Bolts for Web Filler
-
-
Welding Steel Roof Beam
-
-
Podium Deck Concrete Placement and Tooling
-
-
Podium Deck Concrete Pour
-
-
Podium Deck Rebar Mat
-
-
Pumping Grout at Retaining Walls
-
-
Structural Engineer Checking Rebar Placement
-
-
Block Delivery for RW Walls
-
-
Rebar Mat Placement at Podium Deck
-
-
Sheeting Deck at Podium Deck
-
-
Stocking Block for Retaining Walls
-
-
Waterproofing Applications at Basement Walls
-
-
Concrete Column Tie in to Deck Surface
-
-
Crane Setting Equipment Down in Basement
-
-
Layout for Structural Sub Platform
-
-
Sheeting at Podium Deck Sub Platform
-
-
Sub Platform Building and Placement
-
-
Boom Pump Setup for Basement Wall Pour
-
-
Bracing for Concrete Pour
-
-
Concrete Pour at Basement Walls
-
-
Tea House Footings
-
-
Templates on Site
-
-
Hoisting Roof Beams
-
-
Roof Beams Installed
-
-
Roof Beams Over Front Bedroom
-
-
Setting Moment Frame at Garage
-
-
Start Roof Beam Installation
-
-
Great Room Ceiling Framing
-
-
Heading Out for Lights
-
-
Mezzanine Steel Layout
-
-
Patio Ceiling Framing
-
-
Welding Clips for Steel Beams
-
-
Floor Framing Above Office
-
-
Floor Framing at Rear Deck
-
-
Roof and Wall Layout
-
-
Second Floor Sheathing
-
-
Upper Floor Blocking
-
-
2nd Floor Beams
-
-
Crane Pick 2
-
-
Crane Pick
-
-
Floor Joists
-
-
Shear and Pocket
-
-
Basement interior walls with beracing
-
-
Form work at concrete columns
-
-
Structural inspection
-
-
Structural review with aqx
-
-
Tie upper steel installs at basement wall
-
-
Vertical rebar at retaining walls in rear lower courtyard
-
-
Begin set basement vertical wall forms
-
-
Concrete pour at basement light wells
-
-
Concrete pour
-
-
Layout at exterior form walls
-
-
Placing concrete at basement mat slab
-
-
Placing footing steel and verticals at retaining walls
-
-
Placing vertical steel for basement walls
-
-
Retaining wall footings outside basement
-
-
Retaining walls excavation
-
-
Set vertical rebar at opening to basement
-
-
Full length of sub drain at east property side
-
-
Installation of vertical wall ties at basement
-
-
layout and install rebar at mat slab
-
-
Layout for vertical wall ties to slab
-
-
Set up for door threshold at basement entry
-
-
sub grade drain system at east side
-
-
dig for drains in lightwells
-
-
rebar stockpile for basement slab
-
-
sand over membrane at basement slab
-
-
slab preperation with waterproofing membrand
-
-
finish grading at basement
-
-
Prepping subgrade at basement pad
-
-
Soil conditioning and slab prep
-
-
Subdrain system at east side of property
-
-
Subsurface main drain line
-
-
Cutting the basement entry from courtyard
-
-
Cutting the layback
-
-
Digging the layback at east wall
-
-
Plan review and set up
-
-
Basement excavation
-
-
APC RW 2
-
-
Clean Site
-
-
Trench
-
-
Completed Floor
-
-
Crane and Lumber
-
-
Mid Floor Framing 1
-
-
Mid Floor Framing 2
-
-
Mid Floor Framing 3
-
-
Crane 2
-
-
Deck Beam
-
-
Floor Blocking and Joisting
-
-
Floor Sheathing 2
-
-
Office Joists 2
-
-
Completed Drive Wall S
-
-
Completed Walls Waterprooofed
-
-
Equipment Wall
-
-
Placing Stair Wall
-
-
Stairway Site Wall Form
-
-
Closing Wall Forms
-
-
Equipment Area Wall Form
-
-
Stair Wall Column 2
-
-
Stair Wall Steel
-
-
Wall Forms 1 (2)
-
-
Crane and Steel
-
-
Footing Pour 2
-
-
Setting Moment Frame
-
-
Wall Forms 2
-
-
Welding Moment Frame
-
-
Concrete Pour at Slab
-
-
Floating Concrete
-
-
Stripped forms
-
-
Trowelling Concrete
-
-
Washed slab
-
-
Basement Excavation
-
-
Basement layback
-
-
Cutting basement entry to exterior courtyard
-
-
Cutting layback at basement walls
-
-
Planning and action meeting
-
-
Footings for Stair Walls
-
-
Poured in Place Wall Rebar
-
-
Slab Forms and Rebar 001
-
-
Slab Ready for Concrete
-
-
Wall Footings at Driveway
-
-
Second floor framing 3
-
-
Completed pool shell
-
-
Driveway retaining wall in progress
-
-
Garage slab and poured in place walls
-
-
Garage slab concrete pour in progress
-
-
Poured in place walls at utility room
-
-
Placement of the sub drain line and fittings at the front portion of the easterly retaining walls.
-
-
Backfill of east retaining walls. Fill over the subdrainage system with gravel and wrap with filter cloth per the approved grading plans and details. A dirt cap will be placed above the gravel and sub drain system to complete the planter fill.
-
-
Grading equipment delivered to jobsite. Grading operation and excavation of basement proceeding.
-
-
Installation of drainage system behind east retaining walls. This system is to channel any water that collects behind the wall to a site drainage line.
-
-
Layout and preparation of waterproofing membrane and protection fabric to be placed behind east retaining walls
-
-
Completed pool shell
-
-
Placement of the sub drain line and fittings at the front portion of the easterly retaining walls.
-
-
-
Dining Room Finished
-
-
Great Room Finished
-
-
Upper Living Room Finished
-
-
Guest Bedroom Finished
-
-
Master Berdroom Finished
-
-
View from Master Bedroom Balcony
-
-
Kitchen Finished
-
-
Guest Bedroom Finished
-
-
Guest Bathroom
-
-
Guest Bathroom Shower
-
-
View from Guest Bedroom Door
-
-
Guest Bedroom TV Wardrobe Closet
-
-
Dance Studio Completed
-
-
Lower Powder Room Completed
-
-
Lower Stairway Completed
-
-
Upper Living Room Completed
-
-
Upper Living Room Looking Back
-
-
Master Bedroom Looking South
-
-
Master Bathroom Tub and Vanity
-
-
Master Bathroom Sink Cabinet
-
-
Master Bathroom Vanity
-
-
Master Bathroom Shower
-
-
Misa’s Office Southwest Corner
-
-
Misa’s Office South East Corner
-
-
Lower Family Room
-
-
Lower Terrace Complete
-
-
Main Terrace Complete
-
-
Main Level Living Room
-
-
Street Level View
-
-
Slope View
-
-
Beach Path View
-
-
Lower Terrace Looking North
-
-
South Side of Building
-
-
View From Street Above
-
-
Entry Looking Towards the Street
-
-
View From Lower Guest Bedroom
-
-
Lower Terrace Outdoor Living
-
-
Beach Shower
-
-
Water Feature at Rear Terrace
-
-
Street View of Entry
-
-
Water Feature at Entry
-
-
Water Feature at Night
-
-
Street View at Night
-
-
Granite Driveway Cleaned and Sealed
-
-
Upper Living Room Fireplace
-
-
Master Bedroom Fireplace
-
-
Dining Room Fireplace
-
-
Glass Installed Over Entry Trellis
-
-
Upper Street View
-
-
Beach Path View
-
-
Install Garage Door
-
-
Install Granite Slabs at Garage Entry
-
-
Outdoor Fireplace
-
-
Epoxy Floor in Garage
-
-
Outdoor Deak Wall & Fireplace With Hidden TV Cabinet and Storage Room
-
-
Deliver Carpet
-
-
Prep for Final Coat of Epoxy on Garage Floor
-
-
Install Track for Wall Fabric in Studio
-
-
Finishing Touches on Epoxy Floor in Garage
-
-
Install Carpet at Bridge
-
-
Install Roller Shades in Great Room
-
-
Deliver Plants for Side Yard Pots
-
-
Pots Planted on South Side
-
-
Water Filtration System in Secondary Garage
-
-
Wall Cap Installation in North West Corner
-
-
Carpet Installed in Upper Living Room
-
-
Carpet Installed in Master Bedroom
-
-
Prep Slope for Planting
-
-
Install Stone Steps to Beach Path
-
-
Boiler and Chiller Tank Installed in Mechanical Room
-
-
Wood Handrail instaled at Garage Steps
-
-
Install Stone Stepping Pads at Norheast Corner
-
-
Planting Slope
-
-
Install Pocket Door Hardware
-
-
Guest Shower Plumbing Fixtures
-
-
Water Feature Granite being Installed
-
-
Install Door Hardware
-
-
Install Trees in Upper Planters
-
-
Install Glass Tiles in Master Shower
-
-
Install Articulating TV Bracket in Lower Family Room
-
-
Install Wood base over Finish Wood Floor in Studio
-
-
Install Mortise Lock in Studio Pocket Door
-
-
Stone installed at Sunken BBQ Cove
-
-
Install Shutters in Upper Family Room
-
-
Cabinet Hardware Installed in Kitchen
-
-
Outdoor Shower
-
-
Install Planter at Entry
-
-
Install Planter at Norhwest Corner
-
-
Polish Shelves and Cabinet in Tom’s Office
-
-
Install Stone Slabs Over Entry Bridge
-
-
Install stone cap for Entry Column
-
-
Bleach Shutters Before Finish
-
-
Stone Steps and Skirt in Garage
-
-
Polish Floor in Lower Family Room
-
-
Install Roller Shades in Great Room
-
-
Install Granite Watere Wall
-
-
Install Roller Shades in Upper Living Room
-
-
Install Chandelier in Entry Foyer
-
-
Install Granite Slabs for Driveway
-
-
Install Granite Water Feature
-
-
Entry Progress
-
-
Finish TV Great Room Cabinet
-
-
Color Coat PL Walls
-
-
Install Cove Lighting
-
-
Test Lighting
-
-
Install Master Bedroom Balcony Glass
-
-
Spa Equipment Room
-
-
Install Entry Trellis
-
-
Stone Clad Pedestal
-
-
Install Planters
-
-
Install Steps on South Side
-
-
Install Glass Counter in Powder Room
-
-
Install Boiler in Mechanical Room
-
-
Install Elevator
-
-
Finishing Master Closet
-
-
Stone Stairs on South Side Completed
-
-
Clad Columns at Entry
-
-
Install Stone Steps at Northwest Corner
-
-
Install Interior Doors
-
-
Cork Base for Studio Floor
-
-
Studio Sub Floor
-
-
Finished Exterior Plaster
-
-
Color Coat Exterior
-
-
Install Wood Floor in Studio
-
-
Exterior Finishing Progress
-
-
Trim Out Lights and Sprinkler Heads
-
-
Light Mock Up in Vestibule
-
-
Apply Tekon Coating to Windows
-
-
Install floating Stone Deck Master Bedroom Balcony
-
-
Remove Scaffolding after Color Coat
-
-
Floating Deck In Rain
-
-
Scaffolding Removed at the Upper Level
-
-
Install Teak Paneling at Lower Terrace
-
-
Water Proofed Terrace Prior to Floating Stone Deck Installation
-
-
Remove Job site Trailer to Construct Driveway
-
-
Scaffolding and Jobsite Trailer Removed
-
-
Start Excavation for Driveways
-
-
New Water Meter Box Set
-
-
Paneling & Drywall Transition in Studio
-
-
Sanding Studio Floor for Finish
-
-
Footings and Steel Set for Entry Columns
-
-
Column & Planter Construction
-
-
Set Stone for Floating Terrace
-
-
Setting Shoe Base for Glass off Deck
-
-
Finish Color Coat
-
-
Studio Floor Finished
-
-
Laying Floating Stone Pavers at Main Level Terrace
-
-
Pouring Concrete Pedestal Outside Kitchen
-
-
Build Columns at Entry
-
-
Installing Floating Terrace Stone
-
-
Outside Terrace View
-
-
Form Entery Steps
-
-
Drains Under Driveway
-
-
Install Base Shoe for Glass Railing
-
-
Floating Deck Completed
-
-
Form Driveway
-
-
Pour Driveway Base
-
-
Terrace Deck Stone
-
-
Excavate for Underground Plumbing
-
-
Slurry Fill Drainage Pipe Trenches
-
-
Slurry Filled Plumbing and Drainage Pipe Trenches
-
-
Finish Mud Slab
-
-
Waterproof Mud Slab
-
-
Extend Drain Pipes through Foundatrion Slab
-
-
Set Steel for Foundation Mat Slab
-
-
Foundation Slab Ready for Concrete
-
-
Pour Foundation
-
-
Interior Marble Deliveries
-
-
Wood Panel Installations
-
-
Cabinet Installations
-
-
Marble Installation in Tub
-
-
Mosaic Stone Tile Layout Master Shower
-
-
Drywall Mudded & Sanded
-
-
Deliver Marble for Shower
-
-
Master Bath Marble Shower Installation
-
-
Exterior Limestone Cladding
-
-
Master Bath Shower Floor
-
-
Master Bath Cabinets
-
-
Exterior Stone Cladding
-
-
Granite Fireplace & Floating Hearth
-
-
Kitchen Cabinet Installation
-
-
Vanity Counter Top Installation
-
-
Exterior Cladding Installation
-
-
Exterior Cladding Installed
-
-
Exterior Stone Cladding Installation
-
-
Master Tub Top Plumbing
-
-
Master Tub Cladding
-
-
Kitchen Counter Tops
-
-
Stone Cladding at Entry
-
-
Tom’s Office Cabinet
-
-
Glass Tile Wall in Master Bath
-
-
Exterior Cladding In Progress
-
-
Guest Bath Cabinet
-
-
Finishing Island Top in Kitchen
-
-
Guest Bedroom Cabinet Doors
-
-
Studio Pocket Door Installation
-
-
Stone Floor Installations
-
-
Guest Bath Shower Floor Installation
-
-
Exterior Finish Progress
-
-
Stone Floor Installation
-
-
Laundry Room Back Splash
-
-
Kitchen Hood Installed
-
-
Finishing the Master Suite Millwork
-
-
Window Installation
-
-
Paneling & Drywall Transition in Studio
-
-
Stone Steps from Kitchen to Dining
-
-
Installing Awing Off Great Room
-
-
Install Roof Gutter
-
-
Soffit Framing
-
-
Master Bedroom Fireplace
-
-
Fiberglass Planters
-
-
Planter Drainage
-
-
Living Room Fireplace
-
-
Great Room Awning
-
-
Upper Living Room Fireplace
-
-
Install Steel Window Frame in Kitchen
-
-
Install Lights in Upper Living Room
-
-
Install Window Frames in Upper Living Room
-
-
Master Bedroom Deck Framing
-
-
Slope Exterior Deck
-
-
Double Flue Fireplace
-
-
Triple Flue Fireplace Stack
-
-
Set Master Bathroom Tub
-
-
Set Fireplace Shroud
-
-
Excavate Footings for Planter Walls
-
-
Set Steel for Upper Floor Framing
-
-
Extend Wall Hewight at Property Line Retaining Wall
-
-
Strip Shoring Forms from Main Level Structural Deck
-
-
Install Pool Fence Ontop of PL Retaining Wall
-
-
Frame Interior Walls on The Lower Level
-
-
Exterior Columns Framed at the Lower Level
-
-
Cove Ceiling Mockup Framing at the Lower Level
-
-
Stair Steps, Landing and Planters Formed and Reinforced for Pour Outside the Northwest Corner of Building
-
-
Finish Drywall Mockup for Cove Ceiling Detail
-
-
Standing Walls on the Main Level
-
-
Main Level Interior Wall Framing on Main Level
-
-
Consultaion on the Water Proofing of Window Sill
-
-
Office Field Trip
-
-
Floor Joist Over Kitchen and Dining Room Area
-
-
Load Upper Floor Framing with Floor Sheating
-
-
Bridge Floor Framing
-
-
Master Bedroom Floor Sheating
-
-
Upper Floor Sheeted
-
-
Stair Framing
-
-
Shear Panel Garage Walls
-
-
Upper Level Wall Framing
-
-
Main and Upper Level Steel and Wood Framing
-
-
View From Master Bedroom
-
-
Cutting Roof Hips
-
-
Setting Roof Hips Into Place
-
-
Setting Roof Hips Street Side
-
-
Setting Roof Hips Ocean Side
-
-
Installing Roof Rafters
-
-
Form Foundation Walls
-
-
Form Foundation Walls
-
-
Form Structural Columns
-
-
Brace Columns and Walls for Concrete
-
-
Pour Walls and Columns
-
-
Strip Forms
-
-
Install Mira-Drain on Foundation Walls
-
-
Form Garage Mat Slab North
-
-
Pour Mudd Slabs for Garages
-
-
Set Beams for Main Level Deck
-
-
Shoring & Beams Set for Structural Deck North
-
-
Set Structural Steel Columns Garage South
-
-
Set Structural Steel Beams Garage South
-
-
Set Plywood Forms for Structural Concrete Floor
-
-
Install Air Duct Sleeves through Structural Deck
-
-
Install Structural Deck steel
-
-
Install Deck and Support Beam Steel for Structural Deck
-
-
Install Upper Mat of Steel for Structural Deck
-
-
Tie Upper Mat of Steel to Structural Deck Beam
-
-
Pouring and Finishing Main Floor Deck
-
-
Pour and Finishing Main Floor Deck
-
-
Plumbing for Spa
-
-
Plumbing for Water Feature
-
-
Shoring Wall Steel
-
-
Shotcrete PL Shoring Wall
-
-
Shotcrete Spa
-
-
Shotcrete Water Feature Wall
-
-
Wash Out Pits
-
-
View Lot
-
-
Set I beams at North PL
-
-
Install Ibeams at South PL
-
-
Excavate Basemernt at Ocean Side
-
-
End of Work Day
-
-
Excavate for Basement at Street Side
-
-
Basement Excavation
-
-
Basement Excavation
-
-
Drill for Subdrainage
-
-
Trench for Subdrain
-
-
Set Cassion Steel
-
-
Cover Excavation for Rain
-
-
Set Storm Drain Tank
-
-
End of Day
-
-
Air Floor installed at Great Room
-
-
Pour Concrete Over Air Floor Upper Living Room
-
-
Plaster Chimney Shrouds
-
-
Deliver Drywall
-
-
Drywall Installation
-
-
Insulate Ceiling
-
-
Gunite Entry Water Feature
-
-
Pour Bridge at Awning
-
-
Install Drywall
-
-
Waterproof Planters
-
-
Drywall Before Metal Mud
-
-
Form Entry Steps
-
-
Paint Baseboard
-
-
Finish Entry Steps Base Strip Planters
-
-
Install Entry Window Frames
-
-
Install Front Door & Sidelights
-
-
Apply Protective Coatings to Windows
-
-
Strip Walls for Second Layer of Drywall
-
-
Prep For Brown Coat
-
-
Brown Coat Exterior
-
-
Brown Coat Exterior
-
-
Install Metal Corner Aid
-
-
Applying Drywall Mud to Walls & Ceiling
-
-
Brown Coat Lower Terrace Lid
-
-
View Lot
-
-
Set I beams at North PL
-
-
Install Ibeams at South PL
-
-
Excavate Basemernt at Ocean Side
-
-
End of Work Day
-
-
Excavate for Basement at Street Side
-
-
Basement Excavation
-
-
Basement Excavation
-
-
Drill for Subdrainage
-
-
Trench for Subdrain
-
-
Set Cassion Steel
-
-
Cover Excavation for Rain
-
-
Set Storm Drain Tank
-
-
End of Day
-
-
Plumbing for Spa
-
-
Plumbing for Water Feature
-
-
Shoring Wall Steel
-
-
Shotcrete Spa
-
-
Shotcrete Water Feature Wall
-
-
Shotcrete PL Shoring Wall
-
-
Wash Out Pits
-
-
Excavate for Underground Plumbing
-
-
Slurry Fill Drainage Pipe Trenches
-
-
Slurry Filled Plumbing and Drainage Pipe Trenches
-
-
Finish Mud Slab
-
-
Waterproof Mud Slab
-
-
Extend Drain Pipes through Foundatrion Slab
-
-
Set Steel for Foundation Mat Slab
-
-
Foundation Slab Ready for Concrete
-
-
Pour Foundation
-
-
Form Foundation Walls
-
-
Form Foundation Walls
-
-
Form Structural Columns
-
-
Brace Columns and Walls for Concrete
-
-
Pour Walls and Columns
-
-
Strip Forms
-
-
Install Mira-Drain on Foundation Walls
-
-
Form Garage Mat Slab North
-
-
Pour Mudd Slabs for Garages
-
-
Set Beams for Main Level Deck
-
-
Shoring & Beams Set for Structural Deck North
-
-
Set Structural Steel Columns Garage South
-
-
Set Structural Steel Beams Garage South
-
-
Set Plywood Forms for Structural Concrete Floor
-
-
Install Air Duct Sleeves through Structural Deck
-
-
Install Structural Deck steel
-
-
Install Deck and Support Beam Steel for Structural Deck
-
-
Install Upper Mat of Steel for Structural Deck
-
-
Tie Upper Mat of Steel to Structural Deck Beam
-
-
Pouring and Finishing Main Floor Deck
-
-
Pour and Finishing Main Floor Deck
-
-
Excavate Footings for Planter Walls
-
-
Set Steel for Upper Floor Framing
-
-
Extend Wall Hewight at Property Line Retaining Wall
-
-
Strip Shoring Forms from Main Level Structural Deck
-
-
Install Pool Fence Ontop of PL Retaining Wall
-
-
Frame Interior Walls on The Lower Level
-
-
Exterior Columns Framed at the Lower Level
-
-
Cove Ceiling Mockup Framing at the Lower Level
-
-
Stair Steps, Landing and Planters Formed and Reinforced for Pour Outside the Northwest Corner of Building
-
-
Finish Drywall Mockup for Cove Ceiling Detail
-
-
Standing Walls on the Main Level
-
-
Main Level Interior Wall Framing on Main Level
-
-
Consultaion on the Water Proofing of Window Sill
-
-
Office Field Trip
-
-
Floor Joist Over Kitchen and Dining Room Area
-
-
Load Upper Floor Framing with Floor Sheating
-
-
Bridge Floor Framing
-
-
Master Bedroom Floor Sheating
-
-
Upper Floor Sheeted
-
-
Stair Framing
-
-
Shear Panel Garage Walls
-
-
Upper Level Wall Framing
-
-
Main and Upper Level Steel and Wood Framing
-
-
View From Master Bedroom
-
-
Cutting Roof Hips
-
-
Setting Roof Hips Into Place
-
-
Setting Roof Hips Street Side
-
-
Setting Roof Hips Ocean Side
-
-
Installing Roof Rafters
-
-
Installing Awing Off Great Room
-
-
Install Roof Gutter
-
-
Soffit Framing
-
-
Master Bedroom Fireplace
-
-
Fiberglass Planters
-
-
Planter Drainage
-
-
Living Room Fireplace
-
-
Great Room Awning
-
-
Upper Living Room Fireplace
-
-
Install Steel Window Frame in Kitchen
-
-
Install Lights in Upper Living Room
-
-
Install Window Frames in Upper Living Room
-
-
Master Bedroom Deck Framing
-
-
Slope Exterior Deck
-
-
Double Flue Fireplace
-
-
Triple Flue Fireplace Stack
-
-
Set Master Bathroom Tub
-
-
Set Fireplace Shroud
-
-
Install Air Floor
-
-
Air Floor installed at Great Room
-
-
Pour Concrete Over Air Floor Upper Living Room
-
-
Plaster Chimney Shrouds
-
-
Deliver Drywall
-
-
Drywall Installation
-
-
Insulate Ceiling
-
-
Gunite Entry Water Feature
-
-
Pour Bridge at Awning
-
-
Install Drywall
-
-
Waterproof Planters
-
-
Drywall Before Metal Mud
-
-
Form Entry Steps
-
-
Paint Baseboard
-
-
Finish Entry Steps Base Strip Planters
-
-
Install Entry Window Frames
-
-
Install Front Door & Sidelights
-
-
Apply Protective Coatings to Windows
-
-
Strip Walls for Second Layer of Drywall
-
-
Prep For Brown Coat
-
-
Brown Coat Exterior
-
-
Brown Coat Exterior
-
-
Install Metal Corner Aid
-
-
Applying Drywall Mud to Walls & Ceiling
-
-
Brown Coat Lower Terrace Lid
-
-
Interior Marble Deliveries
-
-
Wood Panel Installations
-
-
Cabinet Installations
-
-
Marble Installation in Tub
-
-
Mosaic Stone Tile Layout Master Shower
-
-
Drywall Mudded & Sanded
-
-
Deliver Marble for Shower
-
-
Master Bath Marble Shower Installation
-
-
Exterior Limestone Cladding
-
-
Master Bath Shower Floor
-
-
Master Bath Cabinets
-
-
Exterior Stone Cladding
-
-
Granite Fireplace & Floating Hearth
-
-
Kitchen Cabinet Installation
-
-
Vanity Counter Top Installation
-
-
Exterior Cladding Installation
-
-
Exterior Cladding Installed
-
-
Exterior Stone Cladding Installation
-
-
Master Tub Top Plumbing
-
-
Master Tub Cladding
-
-
Kitchen Counter Tops
-
-
Stone Cladding at Entry
-
-
Tom’s Office Cabinet
-
-
Glass Tile Wall in Master Bath
-
-
Exterior Cladding In Progress
-
-
Guest Bath Cabinet
-
-
Finishing Island Top in Kitchen
-
-
Guest Bedroom Cabinet Doors
-
-
Studio Pocket Door Installation
-
-
Stone Floor Installations
-
-
Guest Bath Shower Floor Installation
-
-
Exterior Finish Progress
-
-
Stone Floor Installation
-
-
Laundry Room Back Splash
-
-
Kitchen Hood Installed
-
-
Finishing the Master Suite Millwork
-
-
Window Installation
-
-
Paneling & Drywall Transition in Studio
-
-
Stone Steps from Kitchen to Dining
-
-
Install Interior Doors
-
-
Cork Base for Studio Floor
-
-
Studio Sub Floor
-
-
Finished Exterior Plaster
-
-
Color Coat Exterior
-
-
Install Wood Floor in Studio
-
-
Finish Color Coat
-
-
Trim Out Lights and Sprinkler Heads
-
-
Light Mock Up in Vestibule
-
-
Apply Tekon Coating to Windows
-
-
Install floating Stone Deck Master Bedroom Balcony
-
-
Remove Scaffolding after Color Coat
-
-
Floating Deck In Rain
-
-
Scaffolding Removed at the Upper Level
-
-
Install Teak Paneling at Lower Terrace
-
-
Water Proofed Terrace Prior to Floating Stone Deck Installation
-
-
Remove Job site Trailer to Construct Driveway
-
-
Scaffolding and Jobsite Trailer Removed
-
-
Start Excavation for Driveways
-
-
New Water Meter Box Set
-
-
Paneling & Drywall Transition in Studio
-
-
Sanding Studio Floor for Finish
-
-
Footings and Steel Set for Entry Columns
-
-
Column & Planter Construction
-
-
Set Stone for Floating Terrace
-
-
Setting Shoe Base for Glass off Deck
-
-
Exterior Finishing Progress
-
-
Studio Floor Finished
-
-
Laying Floating Stone Pavers at Main Level Terrace
-
-
Pouring Concrete Pedestal Outside Kitchen
-
-
Build Columns at Entry
-
-
Installing Floating Terrace Stone
-
-
Outside Terrace View
-
-
Form Entery Steps
-
-
Drains Under Driveway
-
-
Install Base Shoe for Glass Railing
-
-
Floating Deck Completed
-
-
Form Driveway
-
-
Pour Driveway Base
-
-
Terrace Deck Stone
-
-
Finish TV Great Room Cabinet
-
-
Color Coat PL Walls
-
-
Install Cove Lighting
-
-
Test Lighting
-
-
Install Master Bedroom Balcony Glass
-
-
Spa Equipment Room
-
-
Install Entry Trellis
-
-
Stone Clad Pedestal
-
-
Install Planters
-
-
Install Steps on South Side
-
-
Install Glass Counter in Powder Room
-
-
Install Boiler in Mechanical Room
-
-
Install Elevator
-
-
Finishing Master Closet
-
-
Stone Stairs on South Side Completed
-
-
Clad Columns at Entry
-
-
Install Stone Steps at Northwest Corner
-
-
Prep Slope for Planting
-
-
Install Stone Steps to Beach Path
-
-
Boiler and Chiller Tank Installed in Mechanical Room
-
-
Wood Handrail instaled at Garage Steps
-
-
Install Stone Stepping Pads at Norheast Corner
-
-
Planting Slope
-
-
Install Pocket Door Hardware
-
-
Guest Shower Plumbing Fixtures
-
-
Water Feature Granite being Installed
-
-
Install Door Hardware
-
-
Install Trees in Upper Planters
-
-
Install Glass Tiles in Master Shower
-
-
Install Articulating TV Bracket in Lower Family Room
-
-
Install Wood base over Finish Wood Floor in Studio
-
-
Install Mortise Lock in Studio Pocket Door
-
-
Stone installed at Sunken BBQ Cove
-
-
Install Shutters in Upper Family Room
-
-
Cabinet Hardware Installed in Kitchen
-
-
Outdoor Shower
-
-
Install Planter at Entry
-
-
Install Planter at Norhwest Corner
-
-
Polish Shelves and Cabinet in Tom’s Office
-
-
Install Stone Slabs Over Entry Bridge
-
-
Install stone cap for Entry Column
-
-
Bleach Shutters Before Finish
-
-
Stone Steps and Skirt in Garage
-
-
Polish Floor in Lower Family Room
-
-
Install Roller Shades in Great Room
-
-
Install Granite Watere Wall
-
-
Install Roller Shades in Upper Living Room
-
-
Install Chandelier in Entry Foyer
-
-
Install Granite Slabs for Driveway
-
-
Install Granite Water Feature
-
-
Entry Progress
-
-
Install Garage Door
-
-
Install Granite Slabs at Garage Entry
-
-
Outdoor Fireplace
-
-
Epoxy Floor in Garage
-
-
Outdoor Deak Wall & Fireplace With Hidden TV Cabinet and Storage Room
-
-
Deliver Carpet
-
-
Prep for Final Coat of Epoxy on Garage Floor
-
-
Install Track for Wall Fabric in Studio
-
-
Finishing Touches on Epoxy Floor in Garage
-
-
Install Carpet at Bridge
-
-
Install Roller Shades in Great Room
-
-
Deliver Plants for Side Yard Pots
-
-
Pots Planted on South Side
-
-
Water Filtration System in Secondary Garage
-
-
Wall Cap Installation in North West Corner
-
-
Carpet Installed in Upper Living Room
-
-
Carpet Installed in Master Bedroom
-
-
Dining Room Finished
-
-
Great Room Finished
-
-
Upper Living Room Finished
-
-
Guest Bedroom Finished
-
-
Master Berdroom Finished
-
-
View from Master Bedroom Balcony
-
-
Kitchen Finished
-
-
Guest Bedroom Finished
-
-
Guest Bathroom
-
-
Guest Bathroom Shower
-
-
View from Guest Bedroom Door
-
-
Guest Bedroom TV Wardrobe Closet
-
-
Dance Studio Completed
-
-
Lower Powder Room Completed
-
-
Lower Stairway Completed
-
-
Upper Living Room Completed
-
-
Upper Living Room Looking Back
-
-
Master Bedroom Looking South
-
-
Master Bathroom Tub and Vanity
-
-
Master Bathroom Sink Cabinet
-
-
Master Bathroom Vanity
-
-
Master Bathroom Shower
-
-
Misa’s Office Southwest Corner
-
-
Misa’s Office South East Corner
-
-
Lower Family Room
-
-
Clean Driveway
-
-
Lower Terrace Complete
-
-
Main Terrace Complete
-
-
Main Level Living Room
-
-
Street Level View
-
-
Slope View
-
-
Beach Path View
-
-
Lower Terrace Looking North
-
-
South Side of Building
-
-
View From Street Above
-
-
Entry Looking Towards the Street
-
-
View From Lower Guest Bedroom
-
-
Lower Terrace Outdoor Living
-
-
Beach Shower
-
-
Water Feature at Rear Terrace
-
-
Street View of Entry
-
-
Water Feature at Entry
-
-
Water Feature at Night
-
-
Granite Driveway Cleaned and Sealed
-
-
Street View at Night
-
-
Upper Living Room Fireplace
-
-
Master Bedroom Fireplace
-
-
Dining Room Fireplace
-
-
Glass Installed Over Entry Trellis
-
-
Upper Street View
-
-
Beach Path View
-
-